Platform renewal and controller upgrade

Hefei Xiangfu Platform Restart and Controller Retrofit

Thirty 120 kW dual-connector chargers and three 360 kW group-charging hosts received platform and controller upgrades.

CategoryCharger retrofit caseCustomer typeCharging operatorLocationHefei, Anhui, ChinaContent notePublic copy excludes an inconsistent installed-capacity figure in the source material
DC and group-charging integration Protocol adaptation 20-day field implementation
Hefei Xiangfu Platform Restart and Controller Retrofit project image
01

Background

The original platform no longer met operating needs. Both dual-connector chargers and group-charging hosts required migration and controller treatment.

02

Implementation

Communication adaptation and controller replacement were carried out in batches, followed by system and charging-process checks.

03

Outcome

Charging, operating and reconciliation information can now be managed centrally across both equipment types.